The Limited Times

Now you can see non-English news...

The road transport workshops are operating at a high rate to rehabilitate the Hama Halab road from Khan Sheikhoun to Ma`radbasah

2020-02-04T18:01:09.245Z


Hama-SANA continues the mechanisms and technical workshops of the service institutions in Hama, especially in the branch of the General Organization


Hama-Sana

The mechanisms and technical workshops at the service institutions in Hama, especially in the branch of the General Corporation for Road Transport in Hama, continue to carry out the rubble and rehabilitate the international road, Hama, Aleppo, starting from the area of ​​Khan Sheikhoun to the town of Ma`radbasa near Saraqib after the liberation of the Syrian Arab Army from these areas of terrorist groups.

Engineer Mohamed Fadi Saadoun, in charge of the tasks of the Idlib Governor, indicated that the rehabilitation and opening of the Hama road to Aleppo passing through Idlib Governorate is one of the priorities of service work at this stage that is being implemented by the service institutions in Idlib Governorate in cooperation with the General Corporation for Road Transport in Hama, indicating that the length of the road axis Which is witnessing rehabilitation work over 55 km.

Eng. Khader Fatoum, the director of the branch of the General Corporation for Road Transport in Hama, indicated in a statement to a Sana correspondent today that, immediately after the announcement of the liberation of large areas in the southern countryside of Idlib, the Ministry of Transport, through the General Authority for Road Transport, directed an immediate examination of the international highway in the aforementioned axis and determined its needs according to priority In order for it to be cleared and opened to the movement of cars crossing and the return of the people, explaining that the work was divided into three phases, which include cleaning the road, deporting the remains and remnants of the terrorists, wiring the sections that were attacked and cut off directly, restoring and leveling potholes and canyons. Resulting from the bombs and bombs of terrorist groups in the road body.

Engineer Fatoum indicated that work started on the road axis from the Khan Sheikhoun area towards the town of Maardabsa, passing through the area of ​​Maarat al-Numan, which is currently being implemented a large campaign to deport the rubble, open the road through it and rehabilitate the damage caused to it.

In turn, Engineer Ezzat Al-Khalil, Director of Technical Services in Idlib, mentioned that the technical mechanisms and workshops have intensified their work now to rehabilitate this road axis, pointing out that the technical situation in general is good except for some sites that have been sabotaged by terrorists and will be focused on in maintenance and rehabilitation works in Alramdaya Gravel and asphalt asphalt as a prelude to a safe and qualified traffic road.

Abdullah Al-Sheikh

Source: sena

All news articles on 2020-02-04

You may like

News/Politics 2024-04-12T17:00:57.663Z

Trends 24h

News/Politics 2024-04-18T20:25:41.926Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.