The Limited Times

Now you can see non-English news...

Great efforts are being made by Homs electricity workers to deal with emergency faults on the network

2020-01-26T13:52:04.049Z


Homs-Sana A great effort is being made by the emergency workers of the Electricity Company of Homs to fix electrical faults caused by the pressure


Hummus-Sana

Great efforts are being made by the Homs Electricity Company emergency workers to repair the electrical faults that occur due to the great pressure on the network and weather conditions.

The director of the Valley of Gold Emergency Center, Ahlam Assi, stated in a statement to SANA correspondent that the center's workshops are ready around the clock and in all weather conditions to fix breakdowns, as the workshops move from one area to another according to the work program that is determined based on complaints received from citizens, whether by phone Or register the complaint directly within the emergency center, indicating that the faults are fixed within a maximum period of 24 hours, according to the capabilities available to the center.

Assi pointed out that the heavy dependence on electricity during the winter increases the breakdowns in addition to the illegal rent that increases the network’s failures and sometimes leads to the collapse and fall of networks and to the burning of the conversion centers, calling on citizens to cooperate and rationalize the use of electricity, considering the rationalization A civilized case, indicating that Wadi Al-Dahab Emergency Center serves about 15 neighborhoods in the city.

Worker Ali Dardar from the Valley of Gold Emergency Center during his repair, one of the breakdowns with his colleagues, said that the workshops are fully prepared until the late night hours to fix the faults and meet the complaints of citizens, pointing to the large number of breakdowns caused by illegal rent and overloads and called on citizens to cooperate to maintain stability Network.

Worker Ibrahim Mohamed pointed to the great work pressure during the winter season and the great efforts being made by workshop workers to fix faults, stressing that the nature of work in the repair workshops requires full readiness, which he does with his colleagues with great professionalism and openness.

Great and exceptional efforts by emergency workers, especially during difficult weather conditions, according to Bashar Baroudi, director of the Zahra Emergency Center, who confirmed that the center's workshops are in a state of alert around the clock, where workers are divided into 3 shifts starting from 8 in the morning until 5 in the morning. The following day, noting the great work pressure entrusted to the center, as it serves about 16 neighborhoods, and that workers in the electricity sector are doing their duty to the fullest extent, as well as putting their lives at risk in most cases in order to fix faults and deliver electric nutrition to citizens.

While Mohamed Zyoud, head of Wardia at the Zahra Emergency Center, stated that the faults that occur, whether by phone or recording the complaint personally, are mostly either separation of transfer centers or the melting of tension lines as a result of excessive loads or illegal rent and are fixed according to the order of complaints received while he drew The two workers, Fadi Al-Ahmad and Muhammad Ibrahim, pointed out that major breakdowns that involve drilling or replacing cables are fixed within a maximum period of 48 hours, while small breakdowns are often repaired within hours, confirming that workers in electrical workshops perform their job duties without regard to holidays. Or a Weather conditions of nature work requires it.

A number of citizens noted the efforts made by the workers of the Homs Electricity Company, where Ahmed Abbas, a resident of Al-Woroud neighborhood, pointed out that he had come to register a complaint at the Valley of Gold Emergency Center, where the workshops were directed directly to the place of failure, while Ramzia Saleh indicated the cooperation and response of the workers of the emergency center For complaints received at any time.

Hanadi Dayoub

Source: sena

All news articles on 2020-01-26

You may like

News/Politics 2024-02-08T02:52:40.867Z

Trends 24h

News/Politics 2024-03-28T06:04:53.137Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.