The Limited Times

Now you can see non-English news...

To encourage industrialists to return to their activities ... Installing an electrical transmission center in Palmyra Industrial Area

2020-11-29T14:50:03.578Z


Palmyra-SANA The General Electricity Company of Homs has completed the installation and operation works of a prefabricated electrical transmission center in A.


Palmyra-Sana

The General Electricity Company of Homs workshops completed the installation and operation works of a prefabricated electrical transmission center in the industrial zone of Palmyra.

The head of the Palmyra Electricity Department, Riyadh Al-Hafez, said in a statement to the SANA reporter that the capacity of the transmission center, which would reduce the electrical loads of Palmyra city, amounted to 630 KV, pointing out that it would feed the industrial plants in the region, especially the salt and stone factories, and the blocks that the industrialists rehabilitated after they were damaged. As a result of terrorist attacks.

Al-Hafiz indicated that Palmyra's electricity workshops have extended electrical networks and connected them to the area with a length of about 1,200 meters, which are measures that encourage the return of more industrialists to practice their work in light of providing the necessary services for them.

Adnan Al-Khatib

Source: sena

All news articles on 2020-11-29

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.