Latakia-Sana
After two months of continuous work, MCC workshops completed a large part of the operation of Jabla National Hospital, martyr Ibrahim Naama, to enter the final stages of mud work in all floors of the hospital and the associated sanitary and wooden works and the establishment of mechanical works.
The head of the supervision of the implementation of the project Eng. Aref Ahmed in the Directorate of Health Lattakia that the phase of the hospital is going according to the schedule prepared for them, where the workshops cut a good stage in the electrical, mechanical and health.
Supervising Engineer Ruba Ammouri from the Directorate of Health stated that the studies of mechanical plans from mechanical and founding engineers have been completed to implement them, pointing out that the foundation stage is the most difficult and takes more time in terms of identifying materials and applying the schemes on the ground and noticing possible modifications
بسام إبراهيم Free Membership
Follow the latest news through the Telegram app on smartphones via the link:
https://telegram.me/SyrianArabNewsAgency
Follow our page on the social networking site VK at:
http://vk.com/syrianarabnewsagency