“The project is dead’. As of: February 5, 2024, 9:00 a.m By: Timo Aichele CommentsPressSplit 186 hectares along the motorway are privileged for open-space photovoltaic systems.

According to the study, not even a third of it would have to be used to achieve the goals of the energy usage plan. The Institute for Energy Technology (IfE) at the TH Amberg-Weiden developed it on behalf of the city of Dorfen.