Winter has been unusually hard on the roads in the district this year. Potholes turn many routes into real bumpy roads.

The B 2 near Germering suffered particularly badly. The damage cannot be repaired quickly, especially on the B2. In winter, potholes are usually only temporarily repaired with so-called cold mix. Laying hot asphalt is only possible to a limited extent in cold temperatures. But according to the building authority, the cold mix can only be used for minor damage. The State Building Authority is currently installing around 36 tons of cold mix per week.