Ampel agrees on power plant strategy: 20 new gas power plants are to be built. From a switchover date to be set in 2032, they should then switch completely to hydrogen “between 2035 and 2040” According to coalition circles, the costs are around 16 billion euros for the next 20 years.

The energy industry has been waiting for a long time for a strategy to build hydrogen-capable gasPower plants by 2030. Renewable plants should be massively expanded by then. Currently it is just over half.