Another delay: the signal box at Ostbahnhof will be finished later. As of: March 27, 2024, 4:46 p.m By: Dirk Walter CommentsPressSplit The electronic signal box is being built in this inconspicuous building.

The signal box controls switches and signals from Giesing to Berg am Laim, as well as the Ost bahnhof Leuchtenbergring and St.-Martin-Straße stations. The railway estimates that signal box malfunctions are responsible for ten to 15 percent of all delays.