A special area for wind power could be designated in a forest area on the eastern edge of the municipality of Geltendorf. Preliminary discussions have taken place with the landowners – the first step in land-use planning.

A maximum of four wind turbines with a total height (including rotor diameter) of 250 meters could be built here. The construction and start of operation of the systems is not expected until 2027 at the earliest. Four systems are possible: Community wind power in Geltenderf?.