Guard station at the Wiflinger Weiher: ready for use for the new bathing season.. As of: April 5, 2024, 11:00 a.m By: Veronika Vogel CommentsPressSplit The new guard station at.

the excavator pond should be ready by the swimming season in May. The functional building was presented at the site visit. The watch station is expected to cost around 760,000 euros, with the Wörther Wasserwacht contributing a lot of its own effort.