The suspension continues in 3 blocks of Avellaneda Park, which have historical protection. neighborhood associations and merchants called for a protest in Floresta, in repudiation of the ruling that enabled the continuity of the work.

The mobilization will be at 18 in Alberdi and Mariano Acosta. The branch will be 8.6 km long. 5.6km will be in single hand, while the other 3 will be built in the double hand section of Alber di, from Bruix to General Paz. It is not ruled out that it may be extended in the future.