Tunnel test with exit strategy. As of: March 7, 2024, 3:09 p.m By: Peter Schiebel CommentsPressSplit Five streets meet at Tutzinger-Hof-Platz (on an older drone photo).

Some turning options will be eliminated during the test from the end of March. A new traffic light system will be installed at Tut zinger-hof-platz and will go into operation on March 25th. It is then no longer possible to turn left from the B 2 from the direction of Munich onto Jose-Jägerhuber-Straße or turn from Wittelsbacherstraße onto Weilheim Straße.