The inspection by the Ministry of Communications found severe cellular reception problems on road 443. Wala Car learned that at the conclusion of the inspection it was decided that the office would assist in erecting a mast Reception at the problematic point in order to improve cellular coverage.

Will present the results of the tests to the companies and they will be required to provide an appropriate response to the reception problems as they came up in the test. The other two companies' reception decreased Level 3 several times throughout the trip, in all of them there was one extremely problematic area (which will not be identified here in order not to reveal a vulnerability)