Hama-Sana
Technical workshops at Hama Governorate Electricity Company have completed a special power line at Al-Suqailiya National Hospital, exempted from rationing completely to ensure electricity supply to it around the clock.
Engineer Mohamed Rashid Al-Raidi, director of the General Company for Electricity of Hama province, told SANA today that the new electricity line, which was put into service and investment a few days ago, can produce 20 kVA and a length of 17 kilometers, extending from the Salhab transfer station 230 KV to the hospital directly to ensure the continuity of the current. Electroplating him.
He explained that the implementation of this line, which cost 515 million Syrian pounds, aims to ensure the supply of electricity Skeilp National Hospital electricity and improve the therapeutic and ambulatory services provided to patients and residents.
In the context of the caller Al-Raidi announced that the technical cadres and workshops in the company continue the work of implementing a special line similar and exempt from electric rationing also to feed water pumping stations Nahr al-Bared, which supplies most of the villages of the jungle drinking water, pointing out that the rate of completion of the leased line from the power plant To 80 percent it is scheduled to run and put into service next month.
Follow the latest news through the Telegram app on smartphones via the link:
https://telegram.me/SyrianArabNewsAgency
Follow our page on the social networking site VK at:
http://vk.com/syrianarabnewsagency