Deir Ezzor-Sana
The workshops of Deir Ezzor Water Foundation continued the maintenance and rehabilitation of the sub-lines of the water network in Al-Hamidiya neighborhood with an implementation rate of 50%.
In turn, the head of the maintenance department at the Water Establishment Khalil Junaid explained that the workshops carried out maintenance work for the main line connecting the district Hamidiya 12 inches diameter and is currently working on the maintenance of the sub-lines through sounding the entire network by pilot pumping Fonts diameter 10 inches and plastic lines ranging in diameter 75 And 250 mm, pointing out that the work is accelerating in order to feed the entire neighborhood with water.
Follow the latest news through the Telegram app on smartphones via the link:
https://telegram.me/SyrianArabNewsAgency
Follow our page on the social networking site VK at:
http://vk.com/syrianarabnewsagency