The Limited Times

Now you can see non-English news...

Completion of a large part of the installation and equipping of Jableh Hospital

2019-09-21T11:49:34.537Z

LATTAKA-SANA After two months of continuous work, the MCC workshops completed a large part of the operation



Latakia-Sana

After two months of continuous work, MCC workshops completed a large part of the operation of Jabla National Hospital, martyr Ibrahim Naama, to enter the final stages of mud work in all floors of the hospital and the associated sanitary and wooden works and the establishment of mechanical works.

The hospital project, which the government has approved to allocate and complete in early July, for a total amount of 4,291 billion Syrian pounds, covering an area of ​​10,885 square meters, spread over seven floors and an annex with about 200 beds and different specialties.

The head of the supervision of the implementation of the project Eng. Aref Ahmed in the Directorate of Health Lattakia that the phase of the hospital is going according to the schedule prepared for them, where the workshops cut a good stage in the electrical, mechanical and health.

For his part, Engineer Ayham Marouf, project manager at the Military Construction Execution Institution, said that the black works in the electrical and sanitary installations are going in parallel with the completion of the work of mud and buildings and the processing of mechanical works and are in the final stages of most of the floors of the building.

Supervising Engineer Ruba Ammouri from the Directorate of Health stated that the studies of mechanical plans from mechanical and founding engineers have been completed to implement them, pointing out that the foundation stage is the most difficult and takes more time in terms of identifying materials and applying the schemes on the ground and noticing possible modifications

Eng. Suzanne Garagh also indicated that the most difficult stage in the project has been exceeded, which allows the implementation of the rest of the work easily later, stressing the continuation of work to complete the hospital within the contract period to put him to service as soon as to benefit all the people of the region.

بسام إبراهيم Free Membership

Follow the latest news through the Telegram app on smartphones via the link:

https://telegram.me/SyrianArabNewsAgency

Follow our page on the social networking site VK at:

http://vk.com/syrianarabnewsagency

Source: sena

You may like

Trends 24h

News/Politics 2019-12-10T14:35:01.915Z

Latest

news 2019/12/10    

© Communities 2019 - Privacy