The Limited Times

Now you can see non-English news...

Temporary closure of some secondary streets and soil erosion in a number of Damascus countryside areas

2019-11-16T10:50:00.742Z


Damascus Suburbs-Sana Heavy rainfalls in Wadi Barada area of ​​Damascus countryside led to a temporary closure of the streets of Far


Damascus countryside - Sana

Heavy rainfalls in Wadi Barada area of ​​Damascus countryside led to temporary closure of sub-streets and soil erosion in some places that were directly treated, while no major damage or closure of the main roads in Qalamoun, Wadi Barada and Zabadani areas.

Mayor of Wadi Barada, Eng. Mazen Ramadan, told SANA that the area witnessed heavy rains last night that led to the closure of the Kfar Al-Awamid stream, which is a branch road and a collapse after the Beirut Bridge on the Damascus-Beirut international road. Any drifts of dust in the streets and all the rickets are impassable.

In turn, the head of the municipal council in the city of Zabadani Engineer Bassel Dalati said in a similar statement that heavy rainfalls at night did not lead to the closure of any road except the presence of rain gatherings in some places.

For his part, the mayor of Dimas Talaat Saleh pointed to the occurrence of soil erosion due to heavy rain at night on the road Maysaloun Deir al-Ashayer, which led to the closure of the street for a temporary period where the necessary mechanisms were sent to the area and opened directly, explaining that all roads are there and there is a follow-up to address the problems if they occur.

The head of the technical office in the municipal council of the city of Nabq Eng. Hossam al-Shaqi that rainfalls at night did not lead to the closure of roads and rickets all impassable.

In Jdeidat Al-Wadi, the municipal council and its technical staff started this morning in cooperation with the civil activities to remove the residual floods from the region, according to the council's chairman, Tayseer Mawazini.

In Jdeidet Artouz, the head of the municipal council, Eng. Haitham Ghoneim, confirmed that the mechanisms started since last night to work on opening the ricars on the main street to accommodate the amounts of heavy rain. Pending completion of the work.

In Moadamiyeh between the President of the Municipal Council, Bassam Saada, said that the heavy rains caused damage in the basements as a result of the inability of the ricars to drain the entire water because of the Ghazarha. At the municipality.

Ambassador of Ismail

Source: sena

All news articles on 2019-11-16

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.