The Limited Times

Now you can see non-English news...

Putting service and development projects in Aleppo in service

2020-06-03T20:51:16.159Z


Aleppo-SANA The Ministerial Committee in charge of following up the reconstruction and construction projects in Aleppo today put the pumping group


Aleppo-Sana

The Ministerial Committee in charge of following up the reconstruction and construction projects in Aleppo today put the main pumping group at the joint station in the Al-Assad facility irrigation project in a service house after it has been rehabilitated and maintained due to the damage caused by the terrorist attacks. In the ambassador in the eastern countryside of Aleppo with service.

The cost of the Civil Registry Secretariat building in the ambassador is 400 million liras, and it includes the civil registry secretariats for the ambassadors, Lebanon, Hajib, Khanasir regions, and it provides services for granting a personal card and reality, etc. While the cost of the public road police station in a residence is 128 million liras, and the cost of the road police station in Quiros is 138 million liras.

After the main pumping group was put into service for the al-Assad facility irrigation project, the head of the committee, Minister of Water Resources Eng. Hussein Arnous, told reporters that the pumping group aims to irrigate 6 thousand hectares of agricultural land maintained by the efforts of local cadres, pointing out that the repaired main pump engine is capable To raise 9 cubic meters per second of water from the depth of the lake to the surface, 87 meters high.

Arnous stressed the continuation of work to rehabilitate three other engines and restore life to this 18 thousand hectare facility, thus returning economic life to the region as it was before and achieving benefit to the farmers.

In a similar statement, the Minister of Electricity, Eng. Muhammad Zuhair Kharbutli, referred to the efforts made by the technical workshops of the Ministry to rehabilitate, maintain, and operate the joint conversion station 11/230 kV that was destroyed by armed terrorist groups and that secured the electrical energy for irrigation pumping stations, where a quantity was secured. 7.5 MW for each of the three motors at the pumping station.

The Minister of Interior, Major General Mohamed Khaled Al-Rahmon, stated that the opening of police stations and the Civil Registry Secretariat comes within the government's strategy to rehabilitate what was destroyed by terrorist groups and the plan of the Ministry of Interior to provide the best services and simplify procedures in front of citizens, pointing to the importance of opening road centers in achieving traffic flow and intervention in accidents and assistance as well Work to grant the necessary documents in the Secretariat of the Civil Registry to citizens, as these centers were provided with the necessary computer equipment and linked to networks and secured administrative cadres trained to do so to provide the best service to citizens.

In a similar statement, Minister of Public Works and Housing Eng. Suhail Abdul Latif made it clear during the inspection of the Ministerial Committee the project for the rehabilitation and restoration of youth housing in Al-Masraniya, east of Aleppo, that the implementation of the project comes within the context of the urban renaissance and reconstruction taking place in Aleppo in order to secure a healthy and decent housing for citizens where a sum has been allocated 800 million pounds for the implementation of the modernization project and 400 million pounds for the youth housing project in the Friday market.

To that, the Ministerial Committee reviewed the work of the screening center in Tal Blat and between the engineer Adnan Omran, the director of the branch of seed multiplication in Aleppo, the importance of the center as a vital and strategic project where the seeds are sifted, sterilized and equipped with the latest specifications in quantity and quality and its production capacity is 15 tons per hour of seed and thus can cover the needs of the province Other governorates of the seed, pointing out that the estimated project value is 1.200 billion pounds for the screening center and the warehouse, and there is a cooling and dividing complex for potato seeds, the implementation rate of which reached about 90 percent at a cost of one billion Syrian pounds.

Hussein Diab, Governor of Aleppo, Ahmed Mansour, Secretary of the Aleppo branch of the Arab Socialist Ba'ath Party and Commander of the Governorate Police, participated in developing projects for service and tour.

Qusay Razouk and Marina cellar

Source: sena

All news articles on 2020-06-03

You may like

News/Politics 2024-03-25T15:04:44.045Z
Business 2024-03-12T15:13:28.566Z
News/Politics 2024-03-15T11:48:12.958Z

Trends 24h

News/Politics 2024-03-28T06:04:53.137Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.