The Limited Times

Now you can see non-English news...

New crown pneumonia|Urban Reconstruction Bureau resumes ancillary building work in May, 240 tenants are allocated resettlement units

2020-08-30T03:10:20.010Z


The third wave of pneumonia continued. The Chief Executive of the Urban Renewal Authority, Wei Zhicheng, published a blog today (30th), stating that the epidemic has affected the URA's redevelopment project work. For eligible tenants who choose to resettle, there are 4 times of lottery arrangements that need to be postponed for the side building arrangements, about 250 people The tenant is affected. Wei Zhicheng pointed out that the URA later rented the hotel's banquet hall and divided it into separate rooms to hold a large-scale lottery side building. A total of 240 tenants have been allocated resettlement units, and most of the tenants are now organized. Arrangements for "upstairs".


Social News

Written by: Wang Jieen

2020-08-30 10:59

Last update date: 2020-08-30 10:59

The third wave of pneumonia continued. The Chief Executive of the Urban Renewal Authority, Wei Zhicheng, published a blog today (30th), stating that the epidemic has affected the work of the URA’s redevelopment projects. For eligible tenants who choose to be resettled, there are 4 times lottery arrangements that need to be postponed for the side buildings, about 250 people The tenant is affected.

Wei Zhicheng pointed out that the URA later rented the hotel's banquet hall and divided it into separate rooms to hold a large-scale lottery side building. A total of 240 tenants have been allocated resettlement units, and most of the tenants are now organized. Arrangements for "upstairs".

The URA arranged for a lottery to allocate houses in the hotel banquet hall. Eligible tenants were arranged to wait in different rooms. During this period, a video conference was used to witness the lottery process (left). (Urban Construction Bureau website)

Delayed reconstruction work under the epidemic

Wei Zhicheng pointed out that a total of 10 redevelopment projects in To Kwawan, Central and Western District and Dajiaozui have entered the acquisition and clearance stage. Among them, the resettlement and return of units for more than 200 tenants were not carried out as scheduled due to the epidemic. Site clearance, disassembly, bidding, etc.

He pointed out that in the past, when the URA completed the acquisition of the property ownership in the redevelopment project, eligible tenants who chose to relocate would arrange for them to attend the side building and draw the number of the allocated unit from the lottery box. However, under the epidemic situation, the government and some law firms implemented "work-at-home" arrangements, and the community halls where lotteries were arranged had to be closed. Therefore, four lottery arrangements need to be postponed, affecting approximately 250 tenants.

240 tenants guessed the allocation of units

Wei Zhicheng said that taking into account the needs of the residents, the URA resumed its side building work in May this year and rented a hotel banquet hall in Kowloon City to replace the community hall and allocate public housing and resettlement units for 72 eligible tenants. .

The team set the banquet hall with an area of ​​about 4,000 square feet into 9 independent small rooms, with a maximum of 8 tenants as a group, and arranged them in each waiting area. Staff and tenants are required to wear masks, take their body temperature, and provide alcohol handrubs at the lottery.

With reference to this experience, the URA conducted a number of lotteries for additional buildings from May to August. Together with the previous 72 tenants, 240 tenants have been allocated resettlement units. Most tenants have now The allocation result is arranged "upstairs".

During the handover period, the URA arranged a robot in the Huanran Yiju Office (left picture), which was equipped with a disinfectant spray (middle) to disinfect the site regularly and installed infrared temperature detection function (right picture). (Urban Construction Bureau website)

Disinfect the delivery site

In addition, when the Hong Kong people’s first car-buying project "Huanran Yiju" was handed over, the URA introduced a service robot developed by a foreign country. The robot will be in the "Huanran Yiju" from June to August. It can disinfect the site area and also install infrared body temperature detection function.

He also pointed out that currently his robot has been put into service in the revitalization project of the Chinese mansion at "618 Shanghai Street" in Mong Kok.

New crown pneumonia | About 2,000 foreign domestic helpers participate in virus test Luo Zhiguang: Participation rate still needs to be improved

New crown pneumonia | A 70-year-old male patient in the K5 ward of Eastern District Hospital dies, a total of four diagnosed and three died

New crown pneumonia | The evening market reopens on the first weekend of the crowded Chinese restaurant in Mong Kok, Tsim Sha Tsui, poor business

New crown pneumonia|Tourism industry worries about rental spending, urges government to amend regulations to allow shared offices

Covid-19 | Asymptomatic 29-year-old male police voluntarily tested and confirmed that he returned to work at the police headquarters yesterday

Wei Zhicheng Urban Construction Bureau

Source: hk1

All news articles on 2020-08-30

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.