The Limited Times

Now you can see non-English news...

Further construction work in Nuremberg: Blocking for motorists for days

2021-04-29T18:33:33.542Z


Construction work in Nuremberg. Georg-Strobel-Straße is closed to motorists from May 3rd to 7th. The roadway and parking bays are paved.


Construction work in Nuremberg.

Georg-Strobel-Straße is closed to motorists from May 3rd to 7th.

The roadway and parking bays are paved.

Nuremberg - Bad news for drivers in Nuremberg *.

The Nuremberg Public Space Service Company (SÖR) is paving the missing asphalt surface layer in Georg-Strobel-Straße between Harmoniestraße and the confluence of Gießereistraße from Monday to Friday, May 3rd to 7th.

First the parking bays are paved, then the road.

Nuremberg: asphalt work in Georg-Strobel-Straße - closure for motorists

No car is allowed to drive on Georg-Strobel-Straße in Nuremberg during this period.

The section is closed to car traffic during construction.

In addition, the junctions of Rudolphstrasse, Gießereistrasse and Merkelsgasse are not passable, announced the Nuremberg City Hall.

You are asked to use Nunnenbeckstraße and the surrounding streets.

Nothing changes for pedestrians.

They can pass the construction site and cyclists can too - provided they push their bikes.

Both sides of the sidewalk remain accessible.

The town hall reports that access to the house entrances is possible at any time.

* Merkur.de / bayern is an offer from IPPEN.MEDIA

In another district of the Franconian metropolis there was a serious traffic accident today.

By the way: The most important stories from beautiful Nuremberg are now also available in our brand new, regular Nuremberg newsletter.

Source: merkur

All news articles on 2021-04-29

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.