Drivers who want to go through Holzkirchen have to be prepared for traffic jams and disabilities: On Tuesday, the next hot phase begins with the renovation of the level crossings in Tegernseer Straße and Miesbacher Straße (B13).
Holzkirchen
- The level crossings in Holzkirchen in Miesbacher and Tegernseer Straße will be renewed this year by Deutsche Bahn and equipped with the latest technology.
After Whitsun the next phase will start, Deutsche Bahn announced.
From Tuesday, May 25, 2021 to Friday, June 4, 2021, there will be disruptions to road traffic at the level crossing in the busy Miesbacher Straße.
There the access road has to be opened so that new cable ducts can be laid.
During the construction work, diversions and one-way street regulations will be set up on the B 13 (Miesbacher Straße) and the St 2573 (Tegernseer Straße).
The Tegernseer Straße between Holzkirchen and Lochham and the B 13 between the intersection Miesbacher-Tegernseer Straße and junction B 318 are also affected. Deutsche Bahn asks for your understanding for the impairments.
ag