The Limited Times

Now you can see non-English news...

Pok Oi Hospital built a new transitional house in Heshang Township, Gudong, according to the model of Jiangxiawei Village: No more water leakage

2021-10-18T12:16:23.510Z


Pok Oi Hospital announced today (18th) that the transitional houses located in Jiang Ha Wai, Yuen Long will be completed in stages from March next year. A total of nearly 2,000 units will be provided, including 3 types of rooms of different sizes. The agency emphasized that it has referenced the market


Pok Oi Hospital announced today (18th) that the transitional houses located in Jiang Ha Wai, Yuen Long will be completed in stages from March next year. A total of nearly 2,000 units will be provided, including 3 types of rooms of different sizes.

The agency emphasized that it has made reference to the design of transitional houses in the market and made improvements, including a slight increase in space by one square foot, kitchen and toilet close to the window, and three-layer sound insulation, describing it as the standard for modular houses.


Pok Oi also revealed that it is preparing to develop a transitional housing project similar in scale to Jiangxiawei Village. The site is selected in Kutung Heshang Township. The land is also privately lent. It described the negotiations with the Transport and Housing Bureau as close to the end. Details are expected to be announced at the end of the year.


+4

Pok Oi directors say that the negotiation is "being closed" and details will be announced at the end of the year

The director of Pok Oi Hospital Li Pak-cheng revealed at a press conference this afternoon that he is preparing to develop transitional housing on a privately lent land in Kwu Tung. It is expected to provide about 2,000 units. The scale and development model are similar to the Yuen Long Jiang Ha Wai project.

He continued that he had already negotiated with the Transport and Housing Bureau for several times on the relevant project, describing it as being "finished" and could be implemented when the Transport and Housing Bureau "finished". It is expected that more details will be provided by the end of the year.

It is understood that the location is in Heshang Township, far away from the MTR station, and it is necessary to take a minibus to arrive at Sheung Shui Station, which is inferior to the location of Jiang Xia Wai.

The director of Pok Oi Hospital Li Bocheng revealed that he is preparing to build a transitional house on another privately lent land located in Kwu Tung. It is also expected to provide about 2,000 units. An application can be submitted to the City Planning Board as soon as next month.

(Photo by Gong Jiasheng)

"Boai Jiangxiawei Village" can accommodate about 6000 people

As for the "Pok Oi Jiang Ha Wai Village" on Kam Sheung Road, Yuen Long, there are 8 4-storey residential buildings with a total of 1,998 units, which are expected to accommodate about 6,000 people.

The units are divided into 3 types, including 1,064 units of 1 to 2 persons (152 square feet), 884 units of 3 to 4 persons (229 square feet), and 50 units of 5 to 6 persons or barrier-free (323 square feet).

Each unit is equipped with a separate toilet, bathroom and cooking space.

+2

Pok Oi Hospital’s Board of Directors Project Manager Lau Cheuk Yew said that based on the improvement of the “Nanchang 220” project on Nan Cheong Street in Sham Shui Po, the improvement of the “Nanchang 220” project includes increasing the area by one square foot. , You can set up a washing machine, which can increase the sense of space, flexibility and daylighting. The unit is also equipped with 3-layer sound insulation, which is better than other transitional houses. He described "standardised (standardized) the transitional house planning", and future projects Can refer to this model to speed up the progress.

He also mentioned that this transitional house is also equipped with additional sewage treatment facilities, which are also "container-style" and built using the assembly method.

+2

Research provides relocation and furniture assistance to residents

Regarding the "Nanchang 220" chain furniture store to provide furniture discounts, Liu Zhuoyao revealed that the organization is contacting different homeware stores, hoping to get discounts on suits, but does not have much expectations about this. Frankly, the reply from a furniture store is not positive. At present, the unit can only be equipped with an air-conditioner and a gas stove for bathing.

As for those households who cannot afford the cost of relocation and furniture, he said that he would discuss how to provide assistance.

+2

In addition, he also stated that Boai’s project on Taguling Pingche Road and the former Shengping School has come to an end. It is expected that an application can be submitted to the City Planning Board as soon as next month. It is estimated that about 600 units will be provided, compared with the 711 units announced last year. , Reducing nearly 100 units.

The first batch of units will be completed in the first quarter of next year to complete the construction of 2,000 transitional housing projects in Jiangxiawei, Yuen Long Almost 1.1 billion yuan

01News

Source: hk1

All news articles on 2021-10-18

You may like

Trends 24h

News/Politics 2024-04-16T06:32:00.591Z
News/Politics 2024-04-16T07:32:47.249Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.