Celebrating afterwards is trendy thanks to Corona.
In Maisach, the triple gymnasium has now been officially inaugurated at the secondary school.
Maisach - Although the sports facility has been ready since the beginning of the 2020 school year, it makes sense to celebrate: After all, the project cost around eleven million euros.
In addition, because of the pandemic, schoolchildren and clubs have barely had the opportunity to use the hall.
And last but not least, Maisach has been waiting for a new hall since 2013.
The one and a half year construction period from March 2019 seems to be almost a no brainer.
Architect Ferdinand Krissmayr symbolically handed a key to headmistress Doris Lux. He emphasized that the Maisach sports halls had been crisis-tested: the new single-field hall next door to the middle school (also his work) took in asylum seekers immediately after its completion; In the past school year, due to the pandemic, the new triple hall was primarily used as a large classroom for the graduating students.
But now the sport should finally start, said deputy district administrator Martina Drechsler in her speech.
She emphasized that induction loops in the floor, sound insulation measures and a special acoustic ceiling make the hall particularly useful for the hearing impaired.
The rector added that "everyone benefits from the noise reduction in physical education".
The guests at the ceremony heard how good the acoustics are in the hall when the Fridolinspatzen of the choral society and the wind class of the secondary school provided entertainment.
Mayor Hans Seidl said that you no longer have to worry about looking at the gym roof.
As a precaution, the old hall from the 1970s often had to be closed in winter because of the snow load on the roof.
It also rained in.
Usage restrictions were the order of the day.
The construction of the hall was subsidized by the government with almost two million euros.
The community received around 1.35 million euros for use by its clubs and as an event location.
Most of the rest came from the district.