The Limited Times

Now you can see non-English news...

Bahn presents concrete planning for the ICE route Augsburg-Ulm

2021-10-28T00:25:59.502Z


The plans for the new ICE route between Augsburg and Ulm are becoming more and more specific. Deutsche Bahn (DB) has now narrowed down the possible route even further. Deutsche Bahn intends to present the result in Günzburg today.


The plans for the new ICE route between Augsburg and Ulm are becoming more and more specific.

Deutsche Bahn (DB) has now narrowed down the possible route even further.

Deutsche Bahn intends to present the result in Günzburg today.

Günzburg - A year ago, the DB named four different route variants.

Initially, these routes had a range of 500 meters each.

These routes have now been restricted to 20 meter wide routes.

By the end of next year, the planning should be so advanced that an official regional planning procedure can then take place.

also read

Platform at the Königsstuhl: cutting steel components

For the planned viewing platform at the Königsstuhl - one of the landmarks of northern Germany - the cutting of steel components began on Thursday in Stralsund.

Ostseestaal GmbH will mainly manufacture the floor panels for the tour, said a spokesman.

Platform at the Königsstuhl: cutting steel components

Four cars collide on the B106 in Schwerin

Four cars crashed into each other on a bypass road in Schwerin on Friday morning.

As a police spokeswoman said, at least two people were injured.

After initial investigations, a 64-year-old driver suddenly braked on the B106 because she had health problems.

Three other drivers recognized this too late and then drove the cars into each other and into the 64-year-old's vehicle.

Four cars collide on the B106 in Schwerin

Senate: Köhlbrand Bridge could have disappeared in 15 years

For many people in Hamburg, the Köhlbrand Bridge is a symbol of the city.

However, it will soon no longer be able to fulfill its actual function for traffic in the port.

The plans for the demolition of the bridge and the construction of a tunnel are becoming more concrete.

Senate: Köhlbrand Bridge could have disappeared in 15 years

DB wants to expand the 85-kilometer-long and more than 160-year-old railway line between the two neighboring cities.

The rail project is expected to cost more than two billion euros.

The aim is for high-speed trains to travel between Ulm and Augsburg in just 26 minutes, around a quarter of an hour less than before.

dpa

Source: merkur

All news articles on 2021-10-28

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.