Kenitra-SANA
Quneitra Governorate has started implementing a sewage project in Al-Baath city at a cost of about 25 million Syrian pounds.
The engineer, Ilham Al-Ali, from the technical office in the governorate and supervising the implementation of the project, explained in a statement to SANA reporter that the project serves tens of residential apartments in the eastern neighborhood of Al-Baath city, with the preparation of their infrastructure.
Al-Ali pointed out that the project includes excavation works, the extension of concrete cavities, and their connection to the main sewage line during the 30-day contract period.
In turn, the head of the Baath City Council, Yamen Al-Saeed, indicated that this project comes as a continuation of the work of the administrative unit, including asphalting and maintenance of roads, sewage lines and the electrical network to improve the service reality in the city.