Al-Hasakah-SANA
Yesterday, the Public Establishment for Drinking Water in Al-Hasakah began pumping water to the neighborhoods of the city of Al-Hasakah according to the approved rationing program, after 9 days of stopping pumping due to encroachments on the electrical tension lines feeding the Allouk water station supplying the city.
The Director General of Water, Engineer Mahmoud Okla, stated in a statement to SANA reporter that the number of wells operating at the station is 24 wells and 4 pumps, which ensures stability of pumping operations in the event that the electrical supply continues after removing part of the encroachments on the tension line feeding the station, indicating that pumping operations are carried out according to The approved rationing program, where pumping began towards the eastern and western Al-Nashwa neighborhood and youth housing.
In another context, the mercenaries of the Turkish occupation caused the disconnection of the electric current from the Alouk station as a result of abuses on the tension line feeding the station and the use of electricity to operate agricultural engines for the crops in the agricultural lands seized from the local population, which increases the loads on the tension line and separates the electrical supply from the line from The main station is in the city of Ad-Darbasiyah.
Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency