Al-Hasakah-SANA
The reality of the electrical supply of the Allouk water pumping station project, which feeds the city of Hasaka and the western countryside of the governorate, witnessed stability, which led to the regularity of the project's work and its production of water.
The General Director of the Electricity Company, Eng. Anwar Okla, stated in a statement to SANA reporter that the Allouk pumping project is operating at its normal production capacity after the stability of the electrical supply operating the wells and horizontal pumps, which was reflected on the stability of the reality of pumping water to subscribers in the city of Hasaka and the western countryside, according to the rationing program in force by the General Organization for drinking water.
Okla pointed out that the quantities of electricity produced in the governorate and reaching it amount to 90 megawatts per hour, distributed over 50 megawatts, which are produced in the Suwayda generation facility, in addition to 40 megawatts supplied from the Tabqa Dam, where these quantities are distributed to subscribers according to the rationing program in force by the company.
Last week, the Electricity Company completed the maintenance of the 230 kph line that extends between the Tabqa and Al Bawab and the feeder stations of the governorate, after it was exposed to technical malfunctions in an area near the city of Raqqa.
Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency