The Limited Times

Now you can see non-English news...

The old AEZ is to be replaced by a new building with a café

2022-01-27T07:04:04.187Z


The old AEZ is to be replaced by a new building with a café Created: 01/27/2022, 08:00 The Amper shopping center (AEZ) on Heimstättenstraße is to be larger and more modern. © Peter Fischer Fürstenfeldbruck – The owner family is planning to replace the outdated shopping center with a larger, modern new building including an underground car park. The city wants to accommodate the owners and is p


The old AEZ is to be replaced by a new building with a café

Created: 01/27/2022, 08:00

The Amper shopping center (AEZ) on Heimstättenstraße is to be larger and more modern.

© Peter Fischer

Fürstenfeldbruck – The owner family is planning to replace the outdated shopping center with a larger, modern new building including an underground car park.

The city wants to accommodate the owners and is proposing a change in the development plan for the area on Heimstättenstraße.


Underground car park and café instead of a gas station

According to the owner, the market is no longer viable in its current form.

With a sales area of ​​1,200 square meters, profitable operation is not possible in the long term.

Nevertheless, one wants to hold on to the location.

A two-storey new building with a total of 2,600 square meters of floor space as well as 500 square meters of storage and an underground car park is planned.

A drinks market is also to be accommodated on 750 square meters in the basement.

According to the plans, the gas station will be abandoned.

A café is to be built on the northern edge of the Alpenstrasse.


Councilors praise and suggestions

The submitted plans were unanimously welcomed by the building committee. It is

"important to maintain a supply center in this district,"

said the committee chairman and second mayor

Christian Stangl

(Greens).

Franz Höfelsauer

(CSU) is pleased "

that the cars can be taken from the parking lot to an underground car park."

This would also "

improve the quality of stay in the entire area

", agrees parliamentary colleague

Andreas Lohde

.

Alexa Zierl

(ÖDP) suggested covering the bike parking spaces planned instead of the parking spaces and BBV parliamentary group leader

Christian Götz

praised the intention to include a café in the plans.

This is "

important now that Café Rieger no longer exists

." There were

"not enough social meeting places there anyway

."

No "closed box" desired

The head of the building authority, Johannes Dachsel

,

reiterated the importance of a local supply center "that can be reached on foot", but recommends attaching conditions to the basic resolution presented.

"You can't put a closed box there."

So the building was to be constructed of wood, with a large glass front facing Heimstättenstrasse and a photovoltaic system on the roof.

In addition, the roof areas should be greened.

Examination for apartments

Mirko Pötzsch

(SPD) wants to have it checked whether additional apartments can be built.

"With the appropriate architecture, this should be possible." The traffic officer also calls for a small path to be created from Jägerstrasse onto the site, otherwise "people from this area would have to go completely outside."

Start of construction possibly in two years

Further planning is to be supported by a specialist advisory board that has yet to be set up.

Construction could start in two years.


Peter Fisher

Source: merkur

All news articles on 2022-01-27

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.