The Limited Times

Now you can see non-English news...

The start of the work of connecting Salhab Dam and the Tar Al-Ula Al-Asharnah network

2022-04-19T13:07:22.836Z


Hama, SANA- The works of the hydraulic linkage project between Salhab Dam and the southern irrigation canal in the Tar Al-Ula network have started


Hama-Sana

The works of the hydraulic linkage project between Salhab Dam and the Southern Irrigation Canal in the Tar Al-Ula Al-Asharnah network in the western Hama countryside have been launched.

Engineer Hassan Mahfoud, director of irrigation at the Al-Ghab Development Authority, indicated in a statement to SANA reporter the importance of the project in exploiting the available water to irrigate crops, especially during the upcoming summer season, explaining that the water expected to be utilized will irrigate more than 5,000 hectares.

In turn, the Director of Water Resources, Tawfiq Saleh, stated that the water in this project flows easily without the need to pump it to the southern canal to provide all the lands with irrigation water within the associations of Al-Sarmiyah, Salhab, Al-Safa, Nahr Al-Bared, Al-Salakiyah and the nearby associations to irrigate the seasons, whether summer or winter, because most of the water is on the course of the Deir Shamil River It goes to waste as it is a dam to recharge groundwater and not a dam to conserve and store water.

Ivana Diop

Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency

Source: sena

All news articles on 2022-04-19

You may like

News/Politics 2024-03-27T07:56:25.580Z
News/Politics 2024-04-04T23:57:03.238Z

Trends 24h

News/Politics 2024-04-18T20:25:41.926Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.