As-Suwayda-Sana
The Public Establishment for Drinking Water in As-Suwayda restarted 4 wells after maintaining and repairing them in a number of areas of the governorate.
The director of maintenance and investment in the corporation, Engineer Samih Nasr, said in a statement to SANA reporter today that the restarted wells included the industrial city of Umm al-Zaytoun 1 with a density of 30 cubic meters per hour, Al-Majdal 2 with a density of 28 cubic meters, Al-Raha 4 with the same abundance, and Al-Qurayya 2 with a density of 25 cubic meters per hour.
Engineer Nasr indicated that the wells of Umm al-Zaytoun 1 and Majdal 2 industrial city, two new submersible pumps were installed for them after they stopped working for several days, while the submersible pump of Well Al-Raha 4 was replaced, whose density decreased to less than half, as well as the replacement of the Al-Qurayya 2 well pump.
The workshops of the Public Corporation for Drinking Water in Sweida had recently re-operated the wells of Namira Shahba 2, Jubeeb 2, and Al Thalah Station 19 and 13, after carrying out the necessary repairs and maintenance.
long life
Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency