The Limited Times

Now you can see non-English news...

Traffic chaos in GAP the day after G7: wild rumor about Biden vehicle convoy

2022-07-01T03:15:38.470Z


Traffic chaos in GAP the day after G7: wild rumor about Biden vehicle convoy Created: 07/01/2022, 05:00 By: Klaus-Maria Mehr On his way home, US President Joe Biden's convoy of 47 vehicles thundered through the Farchant Tunnel. Now there is traffic chaos in Garmisch-Partenkirchen. © Josef Hildenbrand/dpa/Screenshot Google Maps The Farchant tunnel had been totally closed since Tuesday evening.


Traffic chaos in GAP the day after G7: wild rumor about Biden vehicle convoy

Created: 07/01/2022, 05:00

By: Klaus-Maria Mehr

On his way home, US President Joe Biden's convoy of 47 vehicles thundered through the Farchant Tunnel.

Now there is traffic chaos in Garmisch-Partenkirchen.

© Josef Hildenbrand/dpa/Screenshot Google Maps

The Farchant tunnel had been totally closed since Tuesday evening.

Traffic was stuck all day.

All this one day after the G7 summit in Elmau.

Is there a connection?

  • Total

    traffic

    chaos in

    Garmisch-Partenkirchen

    : The Farchant tunnel is totally closed one day after the end of the G7 summit in Elmau.

  • Lockdown

    after

    G7 summit

    : Did Joe Biden destroy the Farchanter Tunnel?

  • This

    article

    on the closed

    Farchanter Tunnel after G7

    will be continuously updated.

Update, June 30, 8:55 a.m .:

The road construction office responsible for the Farchanter in Weilheim is currently not assuming that Joe Biden and his 47-vehicle column are responsible for the defect when the G7 departs.

The temporal connection is "coincidence," says Christoph Pause, department head of the Weilheim State Building Authority, on Wednesday evening to the BR.

Update 6:28 p.m

.: The error has been corrected, all clear at Farchanter Tunnel.

Traffic is now running regularly and permanently through the tunnel again.

The Mayor of Farchant was able to give the all-clear in the early evening.

Nevertheless, Christian Hornsteiner (CSU) stinks about the constant burden on the village: "The traffic jams have to stop now!"

Update 5:42 p.m

.: In the afternoon, those responsible for the state tree in Weilheim decided to put the Farchanter Tunnel back into operation at least during peak traffic times.

For this purpose, the Farchant fire brigade was put on increased alert.

The tubes are open on Wednesday from 4:30 p.m. to 8 p.m. and on Thursday from 6 a.m. to 10 a.m. during morning rush hour.

In the time intervals outside the designated traffic clearances, the B2 Farchant road tunnel must be closed again to rectify the fault.

The problem could not be solved so far.

Total traffic chaos in Garmisch-Partenkirchen - Tunnel Farchant closed

Original article from 11 a.m., June 29: Garmisch-Partenkirchen

(

original report from 11:03 a.m., updated at 3:33 p.m.

) - Apparently the Farchant tunnel, which connects the important B2 traffic artery between Oberau and Partenkirchen, had to be totally closed during the night .

The cause is technical in nature, the radio system, with which you can call the emergency number from the tunnel, is going completely crazy.

It sends non-stop out of the tunnel and interferes with various frequencies in the area.

It must therefore be turned off and the tunnel completely closed.

An end to the total closure was scheduled for early Wednesday afternoon in the morning, but as of 3:30 p.m. it is still going on.

The complete closure has already triggered traffic chaos around Garmisch-Partenkirchen.

Block processing applies at the Oberau tunnel.

Traffic between Garmisch and Oberau is stopped in both directions.

The federal police are also stuck in traffic on the B2 on their way home from the G7 summit.

© Thomas Very

also read

Special offer after the G7 summit: Luxury hotel gives away furniture - pick up next weekend

G7 in Elmau: Having a spritz with Brigitte Macron and Britta Ernst – Carrie Johnson gives private insights

G7 police officers driving home amplify the traffic jam

The chaos is intensified by the many emergency services returning home.

Around 18,000 police officers are said to have been on duty around the G7 summit, which ended on Tuesday.

Many return to their home inspection sites with heavy equipment such as water cannons and personnel carriers.

Lockdown After G7 Summit - Did Joe Biden Destroy Farchanter Tunnel?

In general, many people feel that there is a connection between the summit and the complete closure of the tunnel - the day after of all things.

There are already various explanations in the village as to who could be to blame.

A wild rumor about the US President's vehicle entourage is being spread with particular relish.

When Joe Biden's 47-car column of vehicles thundered through the Farchanter Tunnel, it is said that the tank-like vehicles destroyed the technology there.

Exactly how, seems already agreed.

Because in Biden's bypass, a jamming signal is sent for safety reasons that blocks certain frequencies, including in his limousine.

A possible explanation would be that the radio system in the tunnel was driven crazy by this interference signal.

This is completely unconfirmed and just a wild rumor.

Troubleshooting and search for causes are ongoing.

By the afternoon there should be less chaos and more clarity.

By the way: everything from the region is also available in our regular GAP newsletter.

Source: merkur

All news articles on 2022-07-01

You may like

Trends 24h

News/Politics 2024-04-18T11:17:37.535Z
News/Politics 2024-04-18T20:25:41.926Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.