Idlib-Sana
The General Company for Electricity of Idlib Governorate has started the rehabilitation of the electrical system in the Al-Tamanah district in the Idlib countryside liberated from terrorism, which was completely damaged.
The director of the company, Mamdouh Abdo, said in a statement to SANA reporter that the rehabilitation works in the first phase included a 20-kilovolt line with a length of 12 kilometers with a 400-kilovolt-ampere-to-air transmission center and a 3-kilometre low network at a cost of 500 million Syrian pounds, which contributes to encouraging the return of people to their homes.
In turn, the head of the Al-Tamanah sub-district council, Ahmed Al-Kanj, explained that the implementation of the infrastructure rehabilitation works re-turned the wheel of life again, despite the destruction and devastation caused by the armed terrorist organizations before their defeat at the hands of the heroes of the Syrian Arab Army.
Abdullah Sheikh
Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency