The Limited Times

Now you can see non-English news...

Roundabout, traffic lights, temporary bridge: preparatory work for the expansion of ED 5 begins

2022-08-20T12:13:21.730Z


Roundabout, traffic lights, temporary bridge: preparatory work for the expansion of ED 5 begins Created: 08/20/2022, 2:00 p.m By: Veronica Power On Monday, August 22, the Freising State Building Authority in Schwaigerloh will start work on the expansion of ED 5. © Photo: Jan Woitas/dpa-Zentralbild/dpa On Monday, August 22, the Freising State Building Authority in Schwaigerloh will start work o


Roundabout, traffic lights, temporary bridge: preparatory work for the expansion of ED 5 begins

Created: 08/20/2022, 2:00 p.m

By: Veronica Power

On Monday, August 22, the Freising State Building Authority in Schwaigerloh will start work on the expansion of ED 5. © Photo: Jan Woitas/dpa-Zentralbild/dpa

On Monday, August 22, the Freising State Building Authority in Schwaigerloh will start work on the expansion of the ED 5.

Schwaigerloh

– In the course of the “Erdinger Ringschluss” project by Deutsche Bahn and the planned expansion of the Schwaigerloh commercial area, the Freising State Building Authority is expanding the ED 5 district road.

According to a statement from the authority, this is expected to happen from November between the connection with state road 2584 (connection to Munich Airport) and the Eichenstraße roundabout in Schwaigerloh over a length of around 850 meters.

(By the way: everything from the region is now also available in our regular Erding newsletter.)

However, before this work can begin, a bypass must first be created via Freisinger Straße between the district road ED 5 and the Südring airport from Monday, August 22nd, so that the ED 5 north of Schwaigerloh can be completely closed.

According to the press release, the Freising State Building Authority is remodeling the existing roads, footpaths and cycle paths in five places:

• The junction with ED 5/Freisinger Straße will be temporarily converted into a roundabout.


• The junction between Südring Flughafen and Freisinger Strasse will be converted into a temporary intersection with traffic lights and turning lanes.


• The median at the junction with St 2584/ED 5 will be provisionally asphalted.


• A makeshift bridge for pedestrians and cyclists is being built at the eastern interception ditch.


• The ED 5 itself will be partially dismantled in preparation for the construction of a bridge over the railway tracks.

During the work on the roundabout and on the southern ring road, motorists and cyclists must expect disabilities and restrictions.

A drive-through is probably always possible.

Source: merkur

All news articles on 2022-08-20

You may like

News/Politics 2024-03-24T08:23:46.176Z
News/Politics 2024-03-09T15:47:39.674Z

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.