The Limited Times

Now you can see non-English news...

The Toulouse incinerator is the most polluting in France, according to an NGO

2022-09-14T19:57:01.206Z


The Toulouse waste incinerator is "by far" the most polluting in France in terms of the amount of nitrogen oxide emissions, according to a report...


The Toulouse waste incinerator is "

by far

" the most polluting in France in terms of the amount of nitrogen oxide emissions, according to a report published on Wednesday by the NGO Zero Waste Toulouse, which denounces a "

lack of obvious political will

" to reduce these releases.

In 2020, this incinerator emitted 322 tonnes of nitrogen oxide (NOx), or "

as much as the three largest French incinerators combined

", underlines the Toulouse branch of this association for the defense of the environment.

The Toulouse incinerator, one of the oldest in France still in operation, is located in the immediate vicinity of schools and homes, in the densely populated district of Mirail.

Reduce the amount of waste

Ranked 8th largest incinerator in France, it also broke average NOx concentration records, with 156 mg/Nm3, far ahead of that of Fos-sur-Mer (Bouches-du-Rhône), second in this ranking with 61 mg/ Nm3.

The "

discovery

" of these figures, from official reports, "

was a shock

," Zero Waste Toulouse administrator Thomas Guilpain told AFP.

In France, an order of September 2002 sets a maximum value for NOx atmospheric emissions at 200 mg/Nm3 as a daily average for incineration facilities.

Read alsoAt the gates of Paris, diving into the fascinating and monstrous bowels of the largest garbage incinerator in Europe

Economic measures were put in place in 2013 "

to encourage operators of incineration facilities to go beyond their simple regulatory obligations

", recalls the NGO's report.

"

There have been efforts in most incinerators in France, and in Toulouse we are almost on the same levels as 20 years ago

," laments Thomas Guilpain.

According to him, "

the problem is not only health

", but it concerns above all "

the urgency to massively reduce the quantity of waste

".

“Lack of planning”

What the report points to, "

is proof that there is a lack of political will (in Toulouse) to tackle this production of waste

", he adds.

An opinion shared by the deputy of La France insoumise (LFI) for the 4th district of Haute-Garonne, François Piquemal.

In Toulouse, for several decades, six years apart, we have had a right-wing policy which has always had a short-termist vision

”, accuses the elected official.

He denounces an “

archetypal lack of planning on all ecological issues

”.

Read alsoWar in Ukraine: does Russia use field incinerators?

Vincent Terrail-Novès, vice-president of Toulouse Métropole, for his part underlined that "

reducing the production of waste (...) is more difficult to implement in large cities like Toulouse

", which has around 800,000 inhabitants, than in smaller communities.

To reduce waste, we need the involvement of residents.

And in Toulouse, we are making a lot of effort to have a readable waste policy

", says Vincent Terrail-Novès, also president of Decoset, a joint union of some 150 municipalities in the Toulouse conurbation in charge of the management of factory.

Public consultation

He recognizes figures "

higher

" than other "

new or renovated for the most part

" incinerators, but relativizes.

About 80% of nitrogen oxides are produced by car traffic, 7% by residential and we represent 3%

,” he says, citing figures from the quality monitoring body. air, ATMO Occitanie.

However, he claims that since 2022, Decoset has invested 46 million euros to reduce the quantity of nitrogen oxide in order to fall below the threshold of 150 mg/Nm3.

Read alsoDioxins near the Ivry incinerator: the ARS requests toxicological expertise

But given that the incinerator, built in 1969, reaches the end of its life in 2030, the mixed syndicate preferred to launch a public consultation as to the future of the installation, explains Vincent Terrail-Novès.

The consultation is scheduled from September 20 to November 27, with three options: the shutdown of the plant in 2030, its renovation or reconstruction, on site or elsewhere.

Source: lefigaro

All news articles on 2022-09-14

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.