The Limited Times

Now you can see non-English news...

State road 2013: complete closure between Markt Rettenbach and Lannenberg

2022-09-28T05:11:29.485Z


State road 2013: full closure between Markt Rettenbach and Lannenberg Created: 09/28/2022, 07:00 The state road 2013 will be renewed in the area between Markt Rettenbach and Lannenberg. The full closure is expected to last until November 25th, 2022. © Breuninger Unterallgäu - The State Road 2013 will be renewed by the Kempten State Building Authority in the area between Markt Rettenbach and Lan


State road 2013: full closure between Markt Rettenbach and Lannenberg

Created: 09/28/2022, 07:00

The state road 2013 will be renewed in the area between Markt Rettenbach and Lannenberg.

The full closure is expected to last until November 25th, 2022.

© Breuninger

Unterallgäu - The State Road 2013 will be renewed by the Kempten State Building Authority in the area between Markt Rettenbach and Lannenberg from September 28th, 2022.

The repair work is necessary due to the poor condition of the road and serves both to improve road safety and traffic flow, the building authority announced in a press release.

In addition to the renewal of the existing structure, the ditch parallel to the road will be filled in the course of widening the roadway.

Furthermore, vehicle restraint systems are retrofitted.

A complete closure is required for the structural implementation of the maintenance measure.

This is expected to last until November 25th, 2022.

After the repair measures between Lannenberg and Eutenhausen as well as between Eutenhausen and Mussenhausen, the third section of the state road 2013 is now being upgraded in accordance with the current technical requirements.

The main focus here is on preservation of the stock.

In addition to restoring the load-bearing capacity, the roadway is to be widened.

For this purpose, the ditch running parallel to the road will be filled and consolidated by means of soil improvement.

In addition, trees standing at the edge of the road and the bridge structure over the Aucherbach will be equipped with vehicle restraint systems.

These are intended to protect road users from leaving the lane and the associated possible collisions.

To ensure that the work can be carried out properly and safely and that the construction time is kept as short as possible, the section of road is completely closed for eight to nine weeks.

Detour route signposted

During this time, traffic will be diverted as follows:

Traffic

coming

from Markt Rettenbach will be routed onto the

MN 28 in the direction of Oberegg

.

From Oberegg

, the detour runs

north on the MN 5 to Dirlewang

.

It is then

routed via the MN 4 to Erisried

, from where one can

reach Mussenhausen and Eutenhausen

.

The traffic routing

from north to south

is carried out

in the opposite direction

.

=> Click here for the diversion plan.

The Kempten State Building Authority is making every effort to keep traffic restrictions to a minimum.

(MK)

also read

B312: Fatal traffic accident near Ochsenhausen

Memmingen: Third citizen workshop of the mobility model region - survey is ongoing

Also visit the Memminger KURIER on Facebook!

Source: merkur

All news articles on 2022-09-28

You may like

News/Politics 2024-03-17T12:46:08.332Z

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.