The Limited Times

Now you can see non-English news...

Paving the industrial zone road in Sheikh Miskin city, Daraa

2022-10-01T08:42:49.741Z


Daraa, SANA- The work of paving the industrial zone road has begun in the city of Sheikh Miskeen in Daraa countryside, at a cost of 77,044 m.


Daraa-Sana

The paving of the industrial zone road has begun in the city of Sheikh Miskin in Daraa countryside, at a cost of 77.044 million Syrian pounds.

The head of the Sheikh Miskin City Council, Walid Al-Jaffal, said in a statement to SANA reporter today that paving the road includes quarrying materials, crushed stone, a length of 416 meters, a width of 6 meters, and a thickness of 20 cm, spraying with impregnation material (MCO), and laying the asphalt shroud with removal of berms. Land, according to a contract between the city council, the Technical Services Directorate and a private contractor.

Al-Jaffal added: Paving the industrial zone road falls within the framework of improving the service situation and rehabilitating the infrastructure, in preparation for the transfer of the facilities of industrialists and craftsmen from inside the city to the industrial zone.

Follow Sana's news on Telegram https://t.me/SyrianArabNewsAgency

Source: sena

All news articles on 2022-10-01

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.