The Limited Times

Now you can see non-English news...

Simple public housing | Sheung Shui site selection "along the mountain corner" "out of the city" to buy food to wait 20 minutes for the bus

2022-12-03T01:13:51.462Z


The government announced the site selection of the first batch of "simple public housing" earlier, one of which is located at the end of Liantang in Sheung Shui, which is expected to provide 1,000 units. The reporter of "Hong Kong 01" made an on-site inspection.


The government announced the site selection of the first batch of "simple public housing" earlier, one of which is located at the end of Liantang in Sheung Shui, which is expected to provide 1,000 units.

A reporter from "Hong Kong 01" made an on-site inspection. The construction site is adjacent to the low-density luxury residence Meyer Park and overlooks the Fanling Golf Course. There is a horticultural factory inside the construction site, and there are many "mud hills" outside. The open space is full of industrial waste.


The basic supporting facilities near Liantangwei are not available, and the traffic is a bit inconvenient. It is a distance from the downtown area of ​​Sheung Shui. .


Simple public housing|A large number of prefabricated houses are erected in front of the Fairview Garden to appreciate the feeling of "no lining" among the residents of Bailu

The "simple public housing" at the end of Liantang in Sheung Shui is now a construction site (the red frame is the approximate location), adjacent to the mansion, overlooking the Fanling Golf Course.

(Photo by Liang Pengwei)

+1

The "simple public housing" in Liantangwei, Sheung Shui is located between Fan Kam Road and Beas River, covering an area of ​​2.8 hectares. It is expected to be developed with "three storeys" and low density, providing about 1,000 units.

+1

It is adjacent to the mansion and overlooks the Fanling Golf Course in the north

The road opposite the construction site is the luxury residence Myer Park and Gough Ridge. Not far to the north is the Fanling Golf Course. The construction site is currently surrounded by factories, garages, and small villages. The roundabout of Nitou Mountain is about two meters high, and there are a lot of industrial waste piled up on both sides.

There is a lack of markets and supermarkets in the Liantangwei area. Residents have to take buses or minibuses to get out of Sheung Shui to buy food. There is a bus line 77K on the road outside the construction site. It takes about 15 minutes to get out of Sheung Shui MTR Station. The stop sign shows that every 20 minutes class one.

Since Fan Kam Highway is a two-lane, two-way road with narrow traffic lanes and many dump trucks entering and exiting, once a traffic accident occurs, the time to go out may increase.

The government plans to build "simple public housing" at the end of Liantang in Sheung Shui.

(government documents)

Simple public housing is expensive?

He Yongxian said that it is similar to transitional housing: the cost is not a simple divisor Simple public housing is more expensive than the construction cost per unit of HOS is nearly 900,000 Housing rejection groups worry about opening the way in disguise. The first batch of simple public housing site selection and cost exposure are all in the New Territories. Residents have the opportunity to be adjacent to luxury houses. The waiting list for public housing has shrunk to 5.6 years.

Source: hk1

All news articles on 2022-12-03

You may like

Trends 24h

News/Politics 2024-04-18T20:25:41.926Z

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.