The Limited Times

Now you can see non-English news...

Tseung Kwan O Cross-Bay Bridge Bus|A list of charges for the 5 new routes via Jianglan Tunnel on 12.12

2022-12-10T07:27:46.460Z


The Jianglan Tunnel and the Tseung Kwan O Cross-Bay Bridge will open to traffic tomorrow (11th) at 8 am. The Transport Department said today (10th) that five new franchised bus routes passing through the Jianglan Tunnel will start next Monday (12th). to


The Jianglan Tunnel and the Tseung Kwan O Cross-Bay Bridge will open to traffic tomorrow (11th) at 8 am. The Transport Department said today (10th) that five new franchised bus routes passing through the Jianglan Tunnel will start next Monday (12th). Service is available through Friday morning and afternoon peak hours.

The five new lines go to Tai Po Industrial Estate, Tsuen Wan West Station, Gan Chuen Street in Cheung Sha Wan, Haida Estate in Cheung Sha Wan and Tsim Sha Tsui East respectively. The most expensive one-way fee is 13.4 yuan.

The daily shifts and fares of the five new lines can be seen clearly in one article.


▼On December 10, Li Jiachao presided over the opening ceremony of the Tseung Kwan O-Lam Tin Tunnel and the Tseung Kwan O Cross Bay Link▼


+4

The Transport Department reminded the public today that the Lam Tin Interchange, Tseung Lam Highway and Huan O Road (including the ancillary cycle paths and footpaths) will be opened at 8 am tomorrow (11th), and drivers can use the new route to travel between Tseung Kwan O, Kwun Tong and the Eastern District underwater tunnel.

Transport Department: Traffic in the new road section and adjacent areas may be busy in the early stage of opening

A spokesman for the Transport Department said that in the early stage of the opening of the new road, the traffic on the new road section and adjacent areas may be relatively busy during certain periods of time.

Drivers can choose appropriate roads (including the Tseung Kwan O Tunnel) to and from Tseung Kwan O according to the actual traffic conditions and destinations, and pay attention to the signs on the spot. Drive slowly and be courteous.

▼The Tseung Kwan O Tunnel will cancel the toll from December 11▼


According to the Transport Department, starting from next Monday, five new franchised bus routes passing through the Tseung Kwan O-Lam Tin Tunnel will provide services during the morning and afternoon peak hours from Monday to Friday (except public holidays), including:

KMB Route No. 96 (Hong Sing Garden - Tai Po Industrial Estate)


KMB Route No. 290E (Tseung Kwan O Industrial Estate - Tsuen Wan West Station)


KMB Route No. 298X (Hang Hau (North) - Cheung Sha Wan (Oasis Street))


NWFB Route No. 790 (Clear Water Bay Peninsula—Tsim Sha Tsui East (Mody Road))


NWFB Route No. 795 (Tseung Kwan O Industrial Estate - Haida Estate (Sham Mong Road))


According to the information on the website of the Transport Department, Line 96 runs between Hong Sing Garden and Tai Po Industrial Estate 8 times a day, with two departures in the morning and evening from the two stops, and the fare is 9.5 yuan; Line 795 goes to and from Tseung Kwan O Industrial Estate And Haida Village (Shenwang Road), a total of four buses a day, 2 buses from Jiangjun Industrial Estate in the morning and 2 buses from Haida Village in the afternoon, the fare is 13.4 yuan.

The bus stops at Lam Tin Interchange and Huan O Road opened on the same day

Passengers can visit the website of the Transport Department or the website of the bus company and mobile applications to learn about the location of the bus route, operating hours and the location of the relevant stations, so as to plan the journey in advance.

The Transport Department has also reminded the bus companies to closely monitor the operation of the relevant routes on the first day of operation and deploy backup buses to meet passenger demand.

The Blue Tunnel will be opened to traffic|Tseung Kwan O Tunnel will be free after midnight tonight. 30 toll collectors may lose their jobs. Going to Hong Kong Island, pay attention to driving. The Tseung Kwan O Cross Bay Bridge will be opened tomorrow. Neighbors will buy bicycles. Step on the bridge and see the new pedestrian bridge. The blue tunnel will be opened to traffic. The opening ceremony will be held today. Use this article to see how to get to the area and rent a bicycle strategy. The Blue Tunnel will be opened to traffic|Tseung Kwan O Tunnel will reduce the free lanes to two for each entry and exit from Sunday

Source: hk1

All news articles on 2022-12-10

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.