Tseung Kwan O District 137 will be developed by reclamation, which can build 50,000 houses and accommodate 135,000 people. The external traffic has attracted much attention.
Liang Xi, member of the Hong Kong Island East Legislative Council of the Democratic Alliance for the Betterment of Hong Kong, "opposite the sea constituency", today (19th) "takes the opportunity" to promote the proposal of the Tseung Kwan O Railway, proposing to extend south and cross the sea, build a new railway station in Siu Sai Wan, and build a new railway station in Xinghua The village station connects to the Hong Kong Island Line.
The Tseung Kwan O Railway Development Plan proposed by Liang Xi proposed to build Siu Sai Wan Station and connect to the Hong Kong Island Line.
(Yang Hee Facebook)
During the campaign, Liang Xi mistakenly strived for the construction of the "Sai Wan Ho MTR Station" and got the title of "Sai Wan Ho Liang Xi". Later, he clarified that he was talking about Siu Sai Wan Station, and he also repeatedly suggested that the establishment of Siu Sai Wan Station should be considered.
He believes that the southward extension project of the Lohas Park branch line under development in Tseung Kwan O is a very good opportunity to build Siu Sai Wan Station.
Traffic from Tseung Kwan O converging on the Kwun Tong Railway crossing the sea is a win-win situation
He explained that the population of Tseung Kwan O Area 137 has increased a lot. No matter which road is used during peak hours, the westbound traffic will eventually converge in Kwun Tong, increasing the traffic load in Kwun Tong.
Therefore, he suggested that the south extension of the railway can cross the sea, build a new station in Siu Sai Wan, and connect to the Hong Kong Island Line at Heng Fa Tsuen Station. This will allow residents of Tseung Kwan O to have multiple travel options, and at the same time solve the problem of no railway in Siu Sai Wan. One railway, win-win for both places.
Tseung Kwan O District 137 planning revealed 20 hectares of sea reclamation south of Lohas Park is expected to build 50,000 houses. Tseung Lam Tunnel|Tseung Kwan O Tunnel’s busy traffic flow is still beyond the design capacity and diversion effect is not as expected. East Kowloon MRT does not refute Lantian Tseung Kwan O catastrophic congestion