As-Suwayda - SANA
The workshops of the General Corporation for Drinking Water in As-Suwayda returned 10 drinking water wells to service after completing their repair.
The Director General of the Corporation, Eng. Amin Ghazali, stated in a statement to SANA reporter that the re-operated wells, which were idle last month, included the wells of the workers’ residences, Al-Jalaa neighborhood, Al-Thala plant No. 2, Al-Thala station No. 16 feeding the city of As-Suwayda, and the wells of the villages of Al-Raha 2, Al-Mutuna 2, Shaqa 2, Amra 2, and Areqa 2. And loose housing.
Ghazali added: Those wells were out of order as a result of the instability of the electrical system feeding them, in addition to the old submersible pumps that are being repeatedly repaired due to the lack of new submersible pumps.
Follow SANA's news on Telegram https://t.me/SyrianArabNewsAgency