The Limited Times

Now you can see non-English news...

Repairing breakdowns and maintenance of transmission centers and power lines in Qamishli

2021-01-22T12:07:28.411Z


Qamishli-SANA The technical workshops of the Qamishli Electricity Department have completed maintenance and repair work on 7 transformation centers


Qamishli-Sana

The technical workshops of the Qamishli Electricity Department have completed the maintenance and repair of 7 transmission centers in the city of Qamishli, and have restored 5 20 / kV voltage lines to service.

In a statement to SANA, the head of the Qamishli Electricity Department, Engineer Hussein al-Ayed, stated that the aim of the maintenance and repair work, which included transmission centers and power lines that were damaged due to overloads, was to ensure the continuity of the electrical current and avoid faults that cause power outages, especially in the winter season.

He pointed out that the repairs included the Assyrian Mousbak centers, Ali Aref, Luli, the employees, Muqbel al-Zaytuna, the Gulf Garden and Rawdat al-Armenian centers, and the 20 / kV tension lines, namely “Silos, Ahmad Shawqi, al-Maqar, Umm al-Fursan and Qadisiyah.

Source: sena

All news articles on 2021-01-22

You may like

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.