The Limited Times

Now you can see non-English news...

After the maintenance and paving of the Hale-Sinai market road in Lattakia

2019-10-05T10:05:29.746Z


Lattakia-Sana The Directorate of Industrial and Craft Areas in Lattakia has established the road linking the industrial zone of Ded


Latakia-Sana

The Directorate of Industrial and Craft Areas in Lattakia put the road between the industrial area of ​​Lattakia and Al-Hal Market to serve after the completion of paving and maintenance works to facilitate the movement of machinery and transport and marketing of vegetables and fruits.

The Director of Industrial Zones in Lattakia, Engineer Mohamed Amin Ali, told SANA that the implementation of this road comes within the plan for the maintenance and rehabilitation of roads within the industrial zone, which is 525 meters long and 10.5 meters wide and serves the market of Al-Hal in the first place and cut the road more than a kilometer in front of its users.

He pointed out that the road serves the car repair area in the industrial area and used by cars with large loads and heavy weights, noting that this required the replacement of paving layers with different depths of up to 130 cm in some sites to reach the foundation layer and then put the remains of quarries and broken stone before paving.

The head of the market committee Ghassan Kheir pointed out in a similar statement that the rehabilitation of the road was one of the most important demands of market investors and farmers who mean to market their products, indicating that it serves more than a thousand cars a day mean the market with different loads and saves time, distance and cost, which is in the interest of farmers and all workers In the market of the cardamom especially that this road was completely closed during the rain.

He expressed his hope to rehabilitate all roads and squares within the market of Al-Hal by extending a new asphalt layer, especially as most of them need rehabilitation and maintenance.

The management of the industrial zone signed earlier the summer of several contracts for the maintenance of roads with the branch of the General Company for Roads and Bridges in Latakia, which has been the maintenance of roads in the region with the paving of a road length of 400 meters and a width of 6 meters serving the car repair area and the entrance and exit of the industrial zone and the main road leading to

Al-Majabal area with a length of one kilometer round and the same way with the maintenance of roads in the car repair section of the industrial area, which serves about 500 divisions and shops.

Bassam Al Ibrahim

Source: sena

All news articles on 2019-10-05

You may like

News/Politics 2024-03-25T17:05:04.768Z
News/Politics 2024-04-05T11:16:01.767Z

Trends 24h

Latest

© Communities 2019 - Privacy

The information on this site is from external sources that are not under our control.
The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.