The fire on the construction site of the future Beauvaisis theater, which was initially due to open in January 2021, has reached the legal level. A company specializing in metal working had to answer for several breaches of regulations.

The architect who designed the building was present at the hearing and was able to recount the events of July 23, 2020. “The fire broke out during the lunch break,” he said. ‘I ran everywhere to evacuate people, until I found myself stuck on the 3rd floor’