By bike from Irschenberg to Tegernsee: This is how the gaps on the B472 should be closed. As of: March 25, 2024, 2:15 p.m By: Dieter Dorby CommentsPressSplit The Leitzach Bridge near Schwaig also needs to be renewed as part of the gap closure.

The Jedlinger Berg (in the background) should also have a cycle path. Of the three critical cycle paths on the route, the first at Wachlehen could be tackled in 2025.