Closing the gap near Penzberg: Construction of the cycle path and sidewalk on the new Loisach Bridge begins.. As of: April 4, 2024, 10:46 a.m By: Andreas Baar CommentsPressSplit Now comes the closure of the gap: the current end of the Cycle path in the south of the New Loisach bridge.

The remaining gap in the pedestrian and cycle path alongside the road will be closed. According to the State Building Authority, the work is expected to run from Monday to May 10th.