Construction work in the Grünwalder swimming pool: Visitors have to be prepared for this. As of: March 1, 2024, 7:15 a.m By: Marc Schreib CommentsPressSplit The renovation work will last until the end of 2025.

The original cost estimate of 5.7 million euros had to be revised upwards to 6.1 million euros. The leisure pool will remain open during the work, and there will even be an outdoor pool in the summer months.