Detailed roadmap for road renovation in Allershausen presented. If all urgent construction work and renovations were carried out, it would cost around 1.1 million euros.

The most expensive of the 15 measures listed include the construction of a sidewalk on the throughroad of Leonhardsbuch at 500,000 euros and the renewal of the water pipes on Bonhofferstrasse and Wilhelm-Löhe-Strasse in Glonnfeld. The local council welcomed the road condition report across the board.