Buchendorf owners' cooperative of the Rechtlerwald would like to have a total of four wind turbines on their property instead of the original one. In return, a facility on municipal property will no longer be required.

The approval process with reports could be completed by the beginning of 2025, said engineer Robert Sing. Species protection should be examined “most intensively’, said mayor Dr. Brigitte Kössinger. Buchendorf was ultimately exempted from wind power by the Bavarian Ministry of Economic Affairs with a “red circle”