Municipal utilities want to build five wind turbines on Brucker Flur. Theoretically, they could go into operation in 2027.

The location is privileged. We are there in the forest, keeping our distance from residential buildings. This is only theoretically possible, said wind power expert Peter Beermann. The wind turbines will be significantly higher (80 meters) than the existing ones at Mammendorf and Malching. From the ground to the top rotor tip it would be 260 meters. This means the yield increases significantly.