Niedernach power plant: Uniper is investing two million euros. As of: March 7, 2024, 5:00 p.m By: Christiane Mühlbauer CommentsPressSplit The overhaul work on the power plant in Niedernbach will take a while.

The transformer and control technology are being replaced, and a machine overhaul is also being carried out. “The overhaul, i.e. the thorough check of the turbine and generator, is the most lengthy and complex work,” says Uniper spokesman.